1. Sr.GM / GM (Planning)
Position title: Sr.GM / GM (Planning)
Number of Positions: 2
Location : Hyderabad
Qualification : B E in either Mechanical or Civil engineering with 20-25 years of experience in Power Project planning and execution .Hands on experience in PRIMAVERA / MS -Projects is must.
Experience : 20-25 years
Reporting to : Project Head / Director
Responsibilities:
| • |
Planning & Monitoring of the project progress w.r.t Time & Cost |
| • |
Co-ordination with Project team members (HO & Site), EPC Contractors and supporting departments. |
| • |
Proactive active action for the Project criticals by evaluating the critical analysis and suggestion for remedial measures. |
| • |
Formulation of Budgets, Budget reviews, cash flows, Monthly fund requirements, etc |
| • |
MIS reports to Customers, Lenders, Lender Engineers, Govt Departments, Statutory authorities, Supporting departments, Managemet, etc. |
| • |
Peridocally Appraising the project staus to Lenders, Lender’s Engineers and organising site visits to asses the physical progress. |
| • |
Implementation of project progress monitoring systems. |
| • |
Organising Progress Review Meetings at HO and Site (with EPC Contractors, among the team members, with supporting departments, with Directors). |
| • |
Facilitating to Project Head, from time to time on project related activities |
2. Head - Operation & Maintenance (O&M)
Position title : Head - Operation & Maintenance (O&M)
Number of Positions: 1
Location : Akaltara near Bilaspur (C.G.)
Qualification : Degree in Mechanical / Electrical Engineering with minimum 20 years of experience in the O&M of Thermal Power Plant of capacity 40 to 70 MW
Experience : 20-30 Yrs
Reporting to : President (Operations)
Responsibilities: The incumbent will be responsible for
| • |
The Operation & Maintenance of Thermal Power Plant |
| • |
The smooth operation of the power generation unit |
| • |
The trouble shooting |
| • |
The harmony in the unit |
| • |
The team management & utilising them adequately and developing them as per the Group's Vision & Mission |
| • |
Reporting on a day to day basis to the President - Operations |
3. Manager - Planning
Position title : Manager - Planning
Number of Positions: 2
Location : Bilaspur (C.G.), Hyderabad (A.P.)
Qualification : Graduate in Civil / Mechanical Engineering with minimum 10 years of experience in planning function with an EPC company. Well versed with MS-Project, Primavera.
Experience : 10-12 Years
Reporting to : Head Planning / Project Head
Responsibilities: • Project planning and ensure the project is completed as per schedule
| • |
Planning & Monitoring of the project progress w.r.t Time & Cost |
| • |
Co-ordination with Project team members (HO & Site), EPC Contractors and Supporting departments. |
| • |
Proactive action for the Project criticals by evaluating the critical analysis and suggestion for remedial measures. |
| • |
Formulation of Budgets, Budget reviews, cash flows, Monthly fund requirements, etc |
| • |
MIS reports to Customers, Lenders, Lender Engineers, Govt Departments, Statutory authorities, Supporting departments, Managemet, etc |
| • |
Peridocally Appraising the project staus to Lenders , Lender’s Engineers and organising site visits to asses the physical progress. |
| • |
Close follow-up with liaison officers at various locations for obtaining statutory approvals / clearances / consents. |
| • |
Implementation of project progress monitoring systems. |
| • |
Organising Progress Review Meetings at HO and Site (with EPC Contractors , Among the team members, with supporting departments, with Directors). |
| • |
Facilitating to Project Head, from time to time on project related activities |
4. Head (Fuel Management)
Position title : Head (Fuel Management)
Number of Positions: 1
Location :Hyderabad (A.P.)
Qualification :Engineering graduate, preferably a Mechanical Engineer with minimum 20 years of experience in Thermal Power Plant and last 5 to 8 years in Fuel (Coal) Management
Experience : 20 Years
Reporting to : President (Operations)
Responsibilities:
| • |
Planning of Fuel (Coal) Quantity and Quality requirement / procurement of the same / monitoring consumption / inventory management |
| • |
Sourcing of Indigenous Coal, Washed Coal, Imported Coal & Lignite and look into the logistics and contractual work |
| • |
Fuel Cost Analysis, Fuel Surcharge working & claim |
| • |
Dealing with Coal Companies, Indian Railway, Coal Suppliers, E auction & payment, Billing, Accounting, Payment etc. |
| • |
Monitoring Fuel Supply, maintaining coal stock at optimum level, follow up with Coal companies, Railway, Coal Handling contractors etc. |
| • |
Evaluating various Techno Economical option for strategically planning and sourcing of Fuel mix viz. Indigenous, Washed and Imported coal |
| • |
Negotiation of Fuel Supply Agreement, Coal Sampling Agreement, Memorandum of Understanding with Coal Companies/CIL Subsidiaries |
| • |
Monitoring coal Quality, coal sampling activity reconciliation of claim with coal suppliers |
| • |
Tendering and managing of various coal supply related contracts and service contracts, negotiation of various terms conditions time to time |
| • |
Knowledge of Washed coal and imported coal related contracts |
| • |
Dealings in Legal, Arbitration Case in relation to Coal Quality Claim etc |
5. Dy. Manager - Mechanical (BTG / BOP)
Position title : Dy. Manager - Mechanical (BTG / BOP)
Number of Positions: 5
Location : Akaltara (C.G.), Hyderabad (A.P.)
Qualification : Mechanical Engineer with minimum 8 years of experience in erection & commissioning of Thermal Power Plants of size 100 MW minimum (single unit) in BTG / BOP packages.
Experience : 8 Years
Reporting to : Mechanical Head
Responsibilities:
| • |
Ensure planning, scheduling, monitoring & timely execution of erection and commissioning of mechanical related work for BTG & BOP equipments |
| • |
Proper co-ordination with civil agencies to get civil foundations for erection, sequentially and priority wise |
| • |
To evaluate & monitor over all work progress of erection & commissioning of equipment as per the set schedule by planning dept |
| • |
Coordination and liaison with authorities during erection |
| • |
To ensure smooth working, Mutual co-ordination, and co-operation among erection groups and with all concern involved in erection activities |
| • |
To be in touch with Planning section so as to get required documents needed for erection and commissioning and to follow up for any details required |
| • |
To prepare Review Notes for Monthly co-ordination meetings at H.O. level |
| • |
To give feedback to all superiors about site activities and progress details related to erection & commissioning as and when required or as per feedback schedule |
| • |
Responsible for handling the stores and update the inward materials and to highlight critical items in advance to ensure sequential erection |
| • |
To make aware all those involved in erection regarding Safety and precautions to be taken during course of erection |
6. Asst. Manager / Dy. Manager – Commercial (SEZ)
Position title : Asst. Manager / Dy. Manager – Commercial (SEZ)
Number of Positions: 2
Location : Warora (M.S.) , Hyderabad
Qualification : graduate / Post Graduate in Commerce, should be conversant with SEZ Rules & Regulations, Procedures for Import & Export.
Experience : 8-10 Years
Reporting to : Head (Commercial & Taxation)
Responsibilities:
| • |
Excise Duty |
| • |
Service Tax |
| • |
VAT |
| • |
CST |
| • |
Customs Duty |
| • |
SEZ Matters |
7. Engineer / Sr.Engineer – Mechanical (Mines / Colliery)
Position title : Engineer / Sr.Engineer – Mechanical (Mines / Colliery)
Number of Positions: 1
Location : Gurha Near Bikaner (Rajasthan)
Qualification :Degree / Diploma in Mechanical Engineer
Experience : 3-7 Years
Reporting to : Mechanical Head
Responsibilities:
| • |
Operation and Maintenance of Fuel Handling System (Crushers / Screens / Conveyors), Weigh Bridge, Mine Pumps, etc. |
| • |
Day to day operation and maintenance work
|
| • |
Procurement of spares and consumables |
| • |
Co-ordination with Contractors |
| • |
Quality procedure implementation and ensure defect free work |
| • |
Ensure safety and Training of operating personnel. |
| • |
Maintenance of records. |
8. Engineer / Sr. Engineer – Electrical (Mines / Colliery)
Position title : Engineer / Sr. Engineer – Electrical (Mines / Colliery)
Number of Positions: 1
Location : Gurha Near Bikaner (Rajasthan)
Qualification : Degree / Diploma in Electrical Engineer .Candidates having Electrical Supervisory Certificate from DGMS will be given preference
Experience : 3-7 yrs
Reporting to : Electrical Head
Responsibilities:
| • |
Operation and Maintenance of Fuel Handling System (Crushers / Screens / Conveyors), Weigh Bridge, Mine Pumps, etc. |
| • |
Day to day operation and maintenance work. |
| • |
Statutorial Responsibilities |
| • |
Procurement of spares and consumables |
| • |
Co-ordination with Contractors |
| • |
Quality procedure implementation and ensure defect free work |
| • |
Ensure safety and Training of operating personnel. |
| • |
Maintenance of records. |
9. Expediting Engineers
Position title : Expediting Engineers
Number of Positions: 11
Location : Hyderabad
Qualification : Any Graduate in Engineering with 4-15 yrs of relevant experience.
Experience : 4-15 Yrs
Travel : Profile involves 60% - 80 % of travel to China
Responsibilities:
| • |
Have to identify the equipments and machineries and understand the manufacturing plans of vendors and check the physical progress of manufacturing and identify deviations, constraints, bottlenecks, etc. if any |
| • |
Have to understand Bill of Material, Packing list, etc. |
| • |
Should be able to get mixed with the vendor’s staff and should be able to extract the exact information |
| • |
Handling engineering project material, cargo related work such as packing, quantity verifications, shipping documentations, port handling, ship loading, etc. |
| • |
Functioning of inland transportations, shipping company, Fright forwarders, clearing house agents, etc. |
10. Sr. Executive / Asst. Manager / Manager – Port Logistics & Coordination
Position title : Sr. Executive / Asst. Manager / Manager – Port Logistics & Coordination
Number of Positions: 05
Location : Hyderabad
Qualification : Any Graduate with 5-20 yrs of relevant experience
Experience : 5-20 Years
Responsibilities:
| • |
Handling all type of cargos such as ocean cargo, air cargo and surface cargo |
| • |
Preparation of manual for logistic function and port coordination activities |
| • |
Import Documentation |
| • |
Tracking of ship / cargo movements |
| • |
Assessing ship unloading capabilities and port’s unloading capabilities |
| • |
Carrying out route survey |
| • |
Ship unloading, custom clearance, dispatch of material to site |
| • |
Monitoring truck movements |
| • |
Handling over dimension cargos, knowledge of all permissions and approvals required for any particular route, dealing with villagers, etc. |
| • |
Understanding utility of different kind of trucks, cranes, hydra, forklifts, gantry cranes, tower cranes, etc |
| • |
Proper coordination with all agencies involved |
| • |
Organising escorts for ODCs and critical cargos |
| • |
Material reconciliation |
| • |
Building a team for logistics function |
| • |
Keeping track of material what is received and what is balance |
| • |
Coordinate with China Expediting team. Materials and stores team at site and HO Materials team |
| • |
Handling insurance related matters in case of damaged material |
| • |
Assist HO, site and China Expediting team for all aspects of materials |
11. Asst. Manager / Manager – Material & Stores
Position title : Asst. Manager / Manager – Material & Stores
Number of Positions: 29 (10-HO), (19-Site)
Location : Hyderabad (HO), Bilaspur (Site)
Qualification : Any Graduate with 5-20 yrs of relevant experience
Experience : 5-20 Years
Responsibilities:
| • |
Planning physical layout of warehouse/stores for storage of materials, Spare parts & consumables and ensuring smooth accounting and issue of material to production & project sites. |
| • |
Proper Identification and location of Materials. |
| • |
Properly Physical Inspection of materials as per PO and Challan/Invoice. |
| • |
Preparation of material receiving reports. Over, short and damage reports Conduct cycle counts and year end physical inventory counts, identification of variances, analysis and resolution and submittal to higher management.
Checking out BOM. |
| • |
Co-ordination and implementation of material handling and material control procedures. |
| • |
Strict on the compliance of Material Issue Receipt and other necessary paper works before the hand over of items to the requisition party. |
| • |
Managing stores operations ensuring optimum inventory levels to achieve maximum cost savings without hampering the production process. |
| • |
Overseeing relocation of business premises / warehouses & analyze expenses, trends, wastage factors for all divisions. |
12. Sr. Executive /Asst. Manager / Manager – Contracts Management
Position title : Sr. Executive /Asst. Manager / Manager – Contracts Management
Number of Positions: 8 (4-HO), (4-Site)
Location : Hyderabad (HO), Bilaspur (Site)
Qualification : B.Tech/B.E – (Civil/ Mechanical/ Electrical) with 5-10 yrs of relevant experience
Experience : 5-10 Years
Responsibilities:
| • |
Handling EPC Contracts in Power Industry. |
| • |
To handle Post Tendering activities. |
| • |
To Handle EPC Contractual agreements & compliance of post tendering activities as per the contracts. |
| • |
Claims Management. |
| • |
Close interaction with the vendors for material manufacturing, dispatch, loading, unloading as per the contractual obligations. |
13. Sr. Engineer/Asst. Manager/Manager – Planning (HO & Site)
Position title : Sr. Engineer/Asst. Manager/Manager – Planning (HO & Site)
Number of Positions: Hyderabad (HO-04) Bilaspur (Site-06)
Location : Hyderabad (HO), Bilaspur (Site)
Qualification : BE in Mechanical / Civil / Electrical Engineering with 05-15 years of experience in EPC Projects
Responsibilities:
| • |
Assist Project Head in the preparation of project execution schedule and assigning and allocating resources for project to ensure successful completion of project meeting time, quality and cost parameters |
| • |
Coordinates project management activities in accordance with the set project specifications, Policies / Guidelines / Systems and procedures laid down by the company and complying laws, orders and directives of Central/ State Govt. |
| • |
Assists Site Head in mobilization of resources such as manpower, plant & machinery, funds, site facilities etc. for smooth execution of project |
| • |
Ensures effective coordination of all project execution activities taken up by different functions such as Civil, Mechanical, Electrical and Instrumentation |
| • |
Studies and interprets project specifications (designs/drawings etc.) given by the consultant for awarded contracts and obtains clarifications wherever necessary |
| • |
Ensures safe custody of all drawings and documents, statutory sanctions, approvals etc. both at office and site and compliance of organizational standards |
| • |
Provides professional direction and guidance to project team in matters related to engineering standards, project specifications, quality etc. |
| • |
Verifies the invoices raised and recommends for release of payments to contractors/sub-contractors, suppliers etc. |
| • |
Reviews and recommends for approval for changes in plans and specifications, variance, partial payment requests and construction schedules |
| • |
Coordinates with consultant, contractors, Govt. authorities etc. to facilitate successful execution of various packages of project |
| • |
Reviews and analyzes periodical MIS received from sites and prepares status reports for submission to Top Management |
| • |
Planning & Monitoring of the project progress w.r.t Time & Cost |
| • |
Co-ordination with Project team members (HO & Site), EPC Contractors and Supporting departments |
| • |
Proactive active action for the Project criticals by evaluating the critical analysis and suggestion for remedial measures |
| • |
Formulation of Budgets, Budget reviews, cash flows, Monthly fund requirements, etc |
14. Lead Mechanical
Position title : Lead Mechanical
Number of Positions :01
Location : Hyderabad (HO)
Qualification : BE in Mechanical Engineering with relevant exp.
Responsibilities:
| • |
To ensure planning, scheduling & timely execution of all Mechanical Erection & Commissioning related work of 6 X 600 MW Power Project at site within budgeted cost & time. |
| • |
Co –ordination with Project Site & HO,SEPCO with other vendors etc for smooth execution of the Project |
| • |
Co-ordination with statutory authorities and CIB (IBR) |
| • |
Guidance to the team members |
| • |
Co ordination with other departments for resolution of interfacing issues and clearances |
| • |
Certifying the SEPCO bills (BOQ)for payment |
| • |
Follow up with SEPCO for meeting the Project schedule |
| • |
Highlighting of the Bottlenecks to HO & SEPCO for timely resolving |
| • |
Quality assurance during installation |
| • |
Quality assurance during installation |
| • |
Facilitating handing over of the equipment to O&M |
15. Sr. Executive/Asst. Manager/Manager – Mechanical (BOP) (HO & Site)
Position title : Sr. Executive/Asst. Manager/Manager – Mechanical (BOP) (HO & Site)
Number of Positions: 16 Hyderabad (HO-07), Bilaspur (Site-09)
Location : Hyderabad (HO), Bilaspur (Site)
Qualification : Diploma or BE/B.Tech in Mechanical Engineering with 04 to 15 yrs of relevant experience.
Responsibilities:
| • |
Ensure planning, scheduling, monitoring & timely execution of erection and commissioning of mechanical related work at site for BOP jobs. |
| • |
Timely and proper co-ordination with civil agencies to get release civil foundations for erection of Mechanical equipments sequentially and priority wise. |
| • |
To evaluate & monitor over all work progress of erection & commissioning of equipment as per the set schedule. |
| • |
To ensure all required inputs in consultation with contractor for overall work progress of Mechanical and other related areas. |
| • |
To ensure smooth working, Mutual co-ordination, and co-operation among erection groups and with all concern involved in erection activities. |
| • |
To guide and educate sub-ordinates and team members of other discipline to understand functioning and systems requirement. |
| • |
To give feedback to all superiors about site activities and progress details related to erection & commissioning as and when required or as per feedback schedule. |
| • |
To be in touch with Planning section so as to get required documents needed for erection and commissioning and to follow up for any details required. |
| • |
To participate in co-ordination meetings with EPC contractor for review of work progress Weekly and Monthly & in same meeting set planning for next Week, to achieve the overall targeted schedule. |
| • |
To prepare Review Notes for Monthly co-ordination meetings at H.O. level. |
| • |
To make aware all those involved in erection regarding Safety and precautions to be taken during course of erection. |
16. Mechanical (BTG) HO/Site
Position title : Mechanical (BTG) HO/Site
Number of Positions: 8, Hyderabad (HO-02), Bilaspur (Site-06)
Location : Hyderabad (HO), Bilaspur (Site)
Qualification : Diploma or BE/B.Tech in Mechanical Engineering with 04 to 15 yrs of relevant experience.
Responsibilities:
| • |
Ensure planning, scheduling, monitoring & timely execution of erection and commissioning of mechanical related work for BTG & BOP equipments |
| • |
Proper co-ordination with civil agencies to get civil foundations for erection, sequentially and priority wise |
| • |
To evaluate & monitor over all work progress of erection & commissioning of equipment as per the set schedule by planning dept |
| • |
Coordination and liaison with authorities during erection |
| • |
To ensure smooth working, Mutual co-ordination, and co-operation among erection groups and with all concern involved in erection activities |
| • |
To be in touch with Planning section so as to get required documents needed for erection and commissioning and to follow up for any details required |
| • |
To prepare Review Notes for Monthly co-ordination meetings at H.O. level |
| • |
To give feedback to all superiors about site activities and progress details related to erection & commissioning as and when required or as per feedback schedule |
| • |
Responsible for handling the stores and update the inward materials and to highlight critical items in advance to ensure sequential erection |
| • |
To make aware all those involved in erection regarding Safety and precautions to be taken during course of erection |
17. Head Electrical and C&I - Site
Position title : Head Electrical and C&I - Site
Number of Positions: 01 Bilaspur
Location : Bilaspur (Site)
Qualification : BEor B.Tech in Electrical/Electronics/Instrumentation engineering with 20 yrs of minimum experience
Responsibilities:
| • |
Co –ordination with Project HO,SEPCO & other vendors etc for smooth execution of the Project |
| • |
Co-ordination with statutory authorities and CSEB officials |
| • |
Guidance to the team members |
| • |
Co ordination with other departments for resolution of interfacing issues and clearances |
| • |
Certifying the SEPCO bills (BOQ)for payment |
| • |
Follow up with SEPCO for meeting the Project schedule |
| • |
Highlighting of the Bottlenecks to HO & SEPCO for timely resolving |
| • |
Highlighting of the Bottlenecks to HO & SEPCO for timely resolving |
| • |
Quality assurance during installation |
| • |
Facilitating handing over of the equipment to O&M |
18. Sr.Engg/Asst Mgnr/Manager –C&I
Position title : Sr.Engg/Asst Mgnr/Manager –C&I
Number of Positions: 10
Experience : 5 – 15 yrs
Location : Bilaspur (Site)
Qualification : Diploma /Graduate / PG in Electronics / Instrumentation Engineering
Responsibilities:
| • |
Reports to package In charge. |
| • |
Day to day interaction with SEPCO for smooth execution of the Boiler C&I work |
| • |
Verification of the materials at site, Inspection and proper storage, ensuring the material as per the BOM |
| • |
Interaction with SEPCO on daily basis for Proper installation erection works |
| • |
Highlighting of the Bottlenecks to his reporting officer |
| • |
Witnessing pre-commissioning tests of the machine/equipment |
| • |
Ensuring erection as per the approved(RFC) drawings |
| • |
Raising punch points |
| • |
Ensuring safe working |
| • |
Expected working areas are MFT/FSSS/SBC/Boiler tube leak detection system/ECB room readiness follow-up and panel & instruments installation/boiler instrumentation/Cable laying/Loop checking/calibration |
19. Sr.Engg/Asst Mgr/Manager – C&I
Position title : Sr.Engg/Asst Mgr/Manager – C&I
Number of Positions: 03
Experience : 5 – 15 yrs
Location : Hyderabad (HO)
Qualification : Diploma / Graduate / PG in Electronics / Instrumentation Engineering
Responsibilities:
| • |
Reports to C&I manager. |
| • |
Co-ordination with site team during project execution. |
| • |
Co-ordination with engineering team/DCPL for resolving technical issue. |
| • |
Witnessing FAT for PLC and its auxiliary |
| • |
To ensure receipt of RFC drawing to site. |
| • |
Site progress monitoring and necessary follow-up |
| • |
Verification of the SEPCO bills for payment |
| • |
Review of engineering documents related to PLCs |
| • |
Highlighting of the Bottlenecks/delays to his reporting officer |
20. Sr,Engg/Asst Manager – Electrical
Position title : Sr,Engg/Asst Manager
Number of Positions: 15
Experience : 4 – 10 yrs
Location : Bilaspur (Site)
Qualification : Diploma /Graduate / PG in Electrical Engineering
Responsibilities:
| • |
Reports to package In charge(M.L – Position 2) |
| • |
Day to day interaction with SEPCO for smooth execution of the Switchyard |
| • |
Attending maintenance issues if any on 33Kv System (WPCL portion) |
| • |
Periodical safety auditing on the electrical equipment and appliances used by SEPCO for construction power |
| • |
Verification of the materials at site, Inspection and proper storage, ensuring the material as per the BOM |
| • |
Interaction with SEPCO on daily basis for Proper installation erection works |
| • |
Highlighting of the Bottlenecks to his reporting officer |
| • |
Witnessing pre-commissioning tests of the Switchyard equipment |
| • |
Backup to the Transformer Engineer |
| • |
Ensuring erection as per the approved(RFC) drawings |
| • |
Raising punch points |
| • |
Ensuring safe working |
21. Sr. Engg/Asst Manager – Electrical – HO
Position title : Sr. Engg/Asst Manager
Number of Positions: 03
Experience : 4 – 10 yrs
Location : Hyderabad (HO)
Qualification : Diploma /Graduate / PG in Electrical Engineering
Responsibilities:
| • |
Reports to HO Electrical In charge. |
| • |
Co-ordination with Switchyard team during execution |
| • |
Co-ordination with engineering team/DCPL for resolving technical issue |
| • |
Highlighting of the Bottlenecks to his reporting officer |
| • |
Attending FAT for Switchyard packages. |
| • |
To ensure receipt of RFC drawing to site. |
| • |
Site progress monitoring and necessary follow-up |
| • |
Verification of the SEPCO bills for payment |
| • |
Review of engineering documents |
| • |
Back up to Transmission lines and RWPH Electrical package Engineer |
22. Sr. Executive /Asst Manager /Manager – Documentation / Archives
Position title : Sr. Executive /Asst Manager /Manager
Number of Positions: : 8 (HO – 4 & Site – 4)
Experience : 5 – 15 yrs
Location : Hyderabad (HO), Bilaspur (Site)
Qualification : Any Graduate
Responsibilities:
| • |
Maintain project procedures, standards, work instructions and guidelines. |
| • |
Ensuring all projects are coordinated as per Document Control procedures. |
| • |
Maintaining Project Document control process (i.e. tracking and reporting on Project document status) |
| • |
Trouble-shooting (Liaise with field and other parties in the resolution of document control issues) |
| • |
Analysis & query based retrieval of project engineer’s request for project related documents as well documents request from authorized sources. |
| • |
Develops, maintains and updates Document Control procedures and incorporates procedures into the Project/Program. |
| • |
Ensures that all aspects of documentations are effectively controlled and categorized i.e. design documentations, communications and non technical documentations, quality records, publications, etc. |
| • |
Controlling and managing incoming & outgoing (Vendor & Design) documents including database establishment and maintenance. |
| • |
Dealing with the follow-up of matters arising from documents, actions and responses. |
| • |
Arrange documentation packages such as isometric/P&ID drawings, construction procedures, specifications and other important documents. |
| • |
In charge and responsible for record and control of traceability records |
23. Chinese Interpreter / Translator
Position title : Chinese Interpreter / Translator
Number of Positions: : 6 (HO- 2 & Site – 4)
Experience : Min 4yrs of Exp in Interpreter /Translation with a Power /Manufacturing Company
Location : Hyderabad (HO), Bilaspur (Site)
Qualification : Graduate in Chinese Language/Any Graduate with Diploma in Chinese Language
Responsibilities:
| • |
Should have good understanding of all the technical terms related to Power Plant. |
| • |
Interpretation from Chinese to English and English to Chinese. |
| • |
Good Exposure to Chinese Language - communication, writing, reading and translation skills. |
| • |
Should be able to interpret related terms of the Finance & Accounts |
| • |
Should be able to coordinate with the Management, Business Development, Finance & Accounting departments. |
| • |
Chinese to English and English to Chinese interpretation for Executive meetings, technical planning, conferences and with Chinese Delegates. |
| • |
Proficiency in computer, MS office with internet and related software's is essential. |
| • |
Document translation for components such as the following: |
| • |
Functional requirements for the project. |
| • |
Infrastructure components and inventories. |
| • |
Strategies and Project Plans. |
Remuneration : Commensurate with experience and qualification
Contact Information : careers@ksk.co.in